Flooring quote checklist
Over 50 checks for comparing flooring quotes in Pakenham 3810 before you look at totals.
Describe your job
Illustrative image, not a completed customer project.
Three flooring quotes for the same rooms can differ widely because each business includes different work. This checklist sets out more than 50 items to compare across quotes for homes in Pakenham 3810 and nearby. Use it before you compare the totals, so a lower price is not simply a smaller job.
You do not need to tick every item for every job. A carpet replacement in two bedrooms needs fewer checks than a whole-house hybrid floor with tile removal. When you have the details together, send your enquiry and up to three independent local businesses can quote.
Before you request quotes
Gather what you know first. The more consistent your description, the easier the quotes are to compare.
- List of rooms, hallways, wardrobes and stairs to be covered.
- Current floor covering in each room.
- Whether the house is on a concrete slab or timber floor.
- Approximate age of the house, especially if built or renovated before 1990.
- Product you want, or a shortlist of two or three options.
- Any known damp, leaks, cracks or damage.
- Doors, stairs, floor vents and wet areas near the work.
- Whether you will live in the house during the job.
- Preferred timing and any fixed dates, such as a move or a sale.
Has the installer seen the floor?
A quote from photos is an estimate. A quote after an on-site measure is more reliable, though hidden conditions can still change it.
- Was the quote based on a site visit or photos?
- Did the installer measure each room?
- Did they look at the base or lift a corner of covering where safe?
- Did they check door clearances and junctions?
- Did they ask about moisture and past leaks?
Product details
The product line should identify exactly what you are buying.
| Check | Why it matters |
|---|---|
| Brand, range and colour named | Stops a substitute product being supplied |
| Thickness or specification noted | Affects height, trims and doors |
| Underlay named, if separate | Underlay affects feel, sound and warranty |
| Quantity and waste allowance stated | Shows how the installer measured |
| Matching trims and nosings named | Avoids mismatched edges |
| Manufacturer’s instructions available | Sets the installation standard |
If one quote names a cheaper product or underlay, the price difference may come from the material, not the labour.
Removal and disposal
- Which rooms include removal of the old floor?
- Which materials: carpet, underlay, vinyl, tiles, boards?
- Gripper strips, staples, nails and adhesive removal included?
- Disposal included, or left on site?
- Skip bin needed, and who arranges it?
- How suspect asbestos material will be handled?
Our flooring removal page explains these items in more detail.
Preparation of the base
Preparation is where quotes differ most. Look for specific descriptions rather than “prep as required”.
- Grinding or scraping of the slab, and where.
- Levelling compound, which rooms and roughly what area.
- Priming, if the system requires it.
- Refixing or replacing timber boards or sheets.
- Moisture testing, the method and the locations.
- How unforeseen preparation is reported and priced.
What does “allowance” mean in a quote?
Some quotes include an allowance for preparation, meaning an estimated amount that may change once the old floor is lifted. Ask what the allowance covers, how it will be measured, and how you will be told if it is exceeded. Our floor preparation page covers this stage.
Edges, trims and doors
- Each junction with another floor is listed.
- Trim type and colour at each junction.
- Skirting kept with beading, or removed and refitted?
- Who repairs paint if skirting is removed?
- Door trimming included, and how many doors?
- Floor vent covers or collars included?
- Stair nosings, if stairs are included.
Our flooring transitions page explains junctions and door clearances.
Furniture, appliances and access
- Furniture moving included, and any limits.
- Appliances such as fridges and dishwashers moved by whom?
- Gas or plumbing disconnection arranged by the right trade?
- Where materials will be stored before installation.
- Where cutting will be done.
- Parking and access requirements.
Timing
- Expected start date and number of days.
- Whether delivery happens before the start date, and when.
- Any acclimatisation period required by the product.
- Drying or curing times for levelling, adhesive or coatings.
- When each room can be used again.
- Room order if you are living in the house.
Our guide to replacing floors in an occupied home helps with planning.
Payment and changes
- Deposit amount and when it is due.
- When progress or final payments are due.
- How variations are documented and approved.
- Who can approve variations if you are not home.
- Whether the quote has an expiry date.
For larger jobs, the Building and Plumbing Commission has information on domestic building contracts in Victoria. Check with the BPC whether your job needs a written contract or a registered builder, rather than relying on an online summary.
Warranty and aftercare
- Product warranty from the manufacturer, and its conditions.
- Workmanship warranty offered by the installer, if any.
- Care instructions for the product.
- Who to contact if a problem appears.
- Spare boards or offcuts left for future repairs.
Keep the accepted quote, invoice, product details and care instructions together.
Stairs, wet areas and special rooms
Some areas carry extra work that is easy to miss in a whole-house quote.
- Stairs: number of steps, landings, finish type and nosing.
- Kitchen: whether the floor runs under cabinets or stops at kickboards.
- Dishwasher and fridge clearance after the floor height changes.
- Laundry and bathroom junctions, and who seals them.
- Garage or outbuilding floors, if included.
- Rooms with large windows and strong sun.
Our stair flooring page explains stair options.
Rental, sale and deadline jobs
- Deadline stated in the enquiry and confirmed by the business.
- Product in stock, or a confirmed delivery date.
- Time allowed for any preparation and curing.
- Access arrangements through a property manager or agent.
Red flags in a flooring quote
Some features of a quote should prompt a question before you accept it. They do not always mean something is wrong, but they deserve a clear answer.
| What you see | What to ask |
|---|---|
| No product name, only a type such as “hybrid” | Which exact product and colour? |
| “Prep as required” with no detail | Which rooms and what work? |
| No mention of removal | Is the old floor removed, and by whom? |
| Large deposit before any measure | Why, and what does it cover? |
| No written terms or contact details | Who is the business, and what are its terms? |
| Pressure to sign on the day | Can I have time to compare? |
A business that answers clearly and puts the answer in writing gives you more to rely on than one that avoids the question.
Checking the business
Before accepting a quote, check the basics:
- Business name and ABN shown on the quote.
- A physical address or clear contact details.
- Insurance details, if you want them, requested directly from the business.
- Reviews or references you can verify independently.
This referral service does not check or vouch for businesses. You are responsible for choosing the business you engage.
Comparing three quotes side by side
Lay the quotes out in a simple table with one column per business. Go down the checklist and mark each item as included, excluded or unclear. Then ask each business to clarify anything marked unclear.
| Item | Business A | Business B | Business C |
|---|---|---|---|
| Product named | |||
| Underlay named | |||
| Removal and disposal | |||
| Preparation described | |||
| Trims and doors | |||
| Furniture | |||
| Timing | |||
| Variations process |
Once the scope is the same, the price comparison means something.
After you accept a quote
Accepting a quote is not the end of the checklist. Before installation day, confirm these final points.
- The product, colour and quantity on the order match the accepted quote.
- The delivery date, and who receives the delivery.
- The start time on the first day, and the expected finish.
- The room order and furniture plan.
- The contact person for each side during the job.
- Any repairs by other trades are finished before the start date.
On completion, walk through every room with the installer. Check edges, trims, doors, vents and stairs. Note anything unfinished in writing before final payment, and agree when it will be done.
How do you raise a question with the installer?
Keep questions short and specific. For example: “Your quote does not mention door trimming. There are four internal doors in the rooms being done. Is trimming included?” Ask for answers by email so they become part of the record.
Ready to get quotes?
Use the enquiry form with your room list and product details. Our hybrid, laminate and vinyl pages cover product-specific questions.
Yes Right Pty Ltd operates this referral service and may receive a fee from the independent businesses it introduces. It does not quote, supply or install. Each business sets its own quote and terms with you.